A buddy was looking for a way to put gravel down in septic field ditches that was better than the old way of dumping it in the ditch and spreading it by hand. I looked around and found one on a job site and asked the guys if I could take a few pics and measurements of their box. They said sure go ahead so I looked it over, took some measurements and came up with a build plan. I ordered the material and got them to brake the metal at a couple critical points to maybe help cut down on cutting and welding once the material was at my shop. I hand sketched some drawings of what I wanted and got to it.
The critical part is having the spreader lay down the correct amount of stone under the pipe and then cover it with the right amount on top. I also added a roller unit later for covering the ditch with protective paper before they back fill the ditch all in one pull down the ditch.
I first started with the under carriage with the pipe that feeds the drain tile into the ditch. These pics are the start and the finish and I'll post some more a little later.
The critical part is having the spreader lay down the correct amount of stone under the pipe and then cover it with the right amount on top. I also added a roller unit later for covering the ditch with protective paper before they back fill the ditch all in one pull down the ditch.
I first started with the under carriage with the pipe that feeds the drain tile into the ditch. These pics are the start and the finish and I'll post some more a little later.